Immersion
Open in appGOAT Story's Gina brew guide uses the closed valve for a complete immersion phase before drawdown. Separating steeping from drainage makes contact time predictable and aims for a smooth, full-bodied cup with even extraction.
Free iOS No signup 1003 recipes by 126 baristas
Parameters
- 15 g
- Coffee
- 250 g
- Water
- 1:16.7
- Ratio
- 93 °C
- Temp
- 5 medium
- Grind
- 5:05
- Total
- ~250 ml
- Yield
What is 5/10 on your Comandante C40 or 1Zpresso? Gota turns it into clicks
Method
5:05 · total-
Pour 1 / 60:0020s
Close the valve. Pour 250g gently.
+250g→ 250g Fill gently Valve: Closed 93°C -
Swirl 2 / 60:2010s
Stir 3 times.
5s Valve: Closed -
Steep 3 / 60:303m
Let it steep.
3m Valve: Closed -
Prepare 4 / 63:305s
Open the valve.
Valve: Open -
Wait 5 / 63:351m30s
Wait until it stops dripping.
1m 30s Valve: Open -
Done 6 / 65:05
Drawdown complete.
Notes
Original source
Recipe by GOAT Story, published at goat-story.com.
More Gina recipes
See all Gina recipesSmart Cold Drip
by GOAT Story
Competition
by GOAT Story
Dark Roast
by GOAT Story
Winning
by Emi Fukahori
Iced
by GOAT Story